AUSERN
‹ Brief for Sunday, 22 November 2026

Germany’s 365-metre wind turbine begins feeding the grid

Engineering, 3 days ago
Schipkau wind turbine
Illustrative: Schipkau wind turbine. Photo: Osidor, CC0

A prototype in eastern Germany has been connected to the grid and is generating electricity. Power generation is the new milestone; the turbine reached its full height earlier.

Why it matters

The test could help show whether stronger winds higher above the ground make more inland sites viable for wind power.

The catch

One prototype producing electricity does not establish its long-term output, reliability or cost.

Sources

  1. GICON-Höhenwindturm eingeweiht und am Netz, GICON, via Windmesse (primary)
  2. Die Lausitz baut das höchste Windrad der Welt, jetzt liefert es Strom, ingenieur.de

Next in this brief

A lab-hatched Australian turtle survives more than a year in the wild

‹ Previous storyNext story ›